Hello! Welcome to Guangdong Jianzheng Intelligent Equipment Co., Ltd. official website!
Product Categories
4dhcpmingchen
Climbing Arm Production Line

Single & Double Arm Vibratory Plating Integrated Frame Intelligent Climbing Production Line: This production line is suitable for fixed plating processes and supports adjustable plating time. The main unit adopts imported Japanese chains for circulating transmission, featuring high stability and low investment cost. It is ideal for mass electroplating production of small and medium-sized parts.

Main Reference Data:

1. Output time: 8–30 seconds per rack

2. Max workpiece size: 0.5 × 1 m

3. Working condition: 24-hour continuous production

4. Max load capacity: 20 kg per rack

5. Lifting height: 0.9–1.2 m